Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Content deleted Content added
deleted old messaged, updated PECVD2
stepper 2 down, deleted >1 week old annc.
Line 8: Line 8:
<!---------------------------------------------->
<!---------------------------------------------->
<!------------- Announcements ---------------->
<!------------- Announcements ---------------->
===== JEOL SEM #2: Up =====
===== Stepper #2: Down until Mon Morning =====
It's been reported that the load arm is malfunctioning and recovery
The transfer rod has been replaced. Please be sure to insert the rod
steps are not working. I will take a look at the tool Monday morning.
slowly and carefully to ensure it doesn't get damaged again. If any
The system is down until further notice.
resistance, rotate left and right while maintaining forward pressure
// [[User:John d|John d]] 19:23, 12 May 2018 (PDT)
and it will smoothly work through the o-rings.
// [[User:John d|John d]] 15:02, 30 April 2018 (PDT)

===== RIE#5 Up, SiCl4 now available =====
SiCl4 is available for use. We tried a new line heater on the SiCl4 and that seemed to do the trick. The system is still pumping slow but is getting better.
// [[User:John d|John d]] 15:00, 27 April 2018 (PDT)


===== PECVD#2: Open Soon =====
===== PECVD#2: Open Soon =====

Revision as of 02:23, 13 May 2018

UCSB NanoFab Announcements

Stepper #2: Down until Mon Morning

It's been reported that the load arm is malfunctioning and recovery steps are not working. I will take a look at the tool Monday morning. The system is down until further notice. // John d 19:23, 12 May 2018 (PDT)

PECVD#2: Open Soon

The Plasma Therm Cortex software update is complete, and the system is operational. Standard recipes requalified. Particle counts are now much lower and around historical levels. Software has a few issues being worked out. Training will be announced soon. // Thibeault 16:37, 10 May 2018 (PDT)