Template:Announcements: Difference between revisions
mNo edit summary |
(plating bench down 6/7th) |
||
Line 17: | Line 17: | ||
HVAC maintenance is complete, the cleanroom is back open for use. |
HVAC maintenance is complete, the cleanroom is back open for use. |
||
// [[User:John d|John d]] 10:13, 1 June 2022 (PDT) |
// [[User:John d|John d]] 10:13, 1 June 2022 (PDT) |
||
===== Plating Bench: Down 6/7 9a-12n ===== |
|||
The plating bench in Bay 4 will be unavailable on Wednesday, 6/7/22 from 9am-noon. Please plan accordingly. |
|||
// [[User:John d|John d]] 12:13, 1 June 2022 (PDT) |
|||
===== Masks Mandatory: May 27-June 12 ===== |
===== Masks Mandatory: May 27-June 12 ===== |
Revision as of 19:13, 1 June 2022
Important Announcements
NanoFab OPEN
HVAC maintenance is complete, the cleanroom is back open for use. // John d 10:13, 1 June 2022 (PDT)
Plating Bench: Down 6/7 9a-12n
The plating bench in Bay 4 will be unavailable on Wednesday, 6/7/22 from 9am-noon. Please plan accordingly. // John d 12:13, 1 June 2022 (PDT)
Masks Mandatory: May 27-June 12
UCSB has reinstituted a mandatory mask mandate for all indoor spaces on campus.
The mandate begins tomorrow, May 27, and extends through June 12.
See the full announcement at this link.
We will provide masks at the metal table in front of the cleanroom entry.
See the full policies at COVID-19_User_Policies // John d 15:48, 26 May 2022 (PDT)
Unaxis-Dep: Down
Deuterated Silane (SiD4) is out. Expected bottle delivery week of May 30th. // John d 09:28, 25 May 2022 (PDT)
New EBL Rates
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
Industrial Users: $405/hour
UC Academic Users: $126/hour
Non-UC Academic Users: $150/hour
UCSB CNSI Incubator USers: $260/hour
//Thibeault 12:21, 9 December 2021 (PST)