Template:Announcements: Difference between revisions
(ASML down update) |
(deleted plating bench downtime, added Gasonics down) |
||
Line 20: | Line 20: | ||
// [[User:John d|John d]] 12:54, 9 June 2022 (PDT) |
// [[User:John d|John d]] 12:54, 9 June 2022 (PDT) |
||
===== |
===== Gasonics Down ===== |
||
Leak in main chamber, tool is down. |
|||
The plating bench in Bay 4 will be unavailable on Wednesday, 6/7/22 from 9am-noon. Please plan accordingly. |
|||
// [[User:John d|John d]] |
// [[User:John d|John d]] 14:35, 27 May 2022 (PDT) |
||
===== Masks Mandatory: May 27-June 12 ===== |
===== Masks Mandatory: May 27-June 12 ===== |
Revision as of 22:26, 10 June 2022
Important Announcements
ASML Down
Hardware delivery ETA updated to June 17th. We’ll schedule an ASML engineer on-site visit to perform the installation, verification and system calibrations. We may have been able to revive the TCU, but have another electrical hardware failure that requires a new part from ASML. // John d 12:54, 9 June 2022 (PDT)
Gasonics Down
Leak in main chamber, tool is down. // John d 14:35, 27 May 2022 (PDT)
Masks Mandatory: May 27-June 12
UCSB has reinstituted a mandatory mask mandate for all indoor spaces on campus.
The mandate begins May 27, and extends through June 12.
See the full announcement at this link.
We will provide masks at the metal table in front of the cleanroom entry.
See the full policies at COVID-19_User_Policies // John d 15:48, 26 May 2022 (PDT)
Unaxis-Dep: Down
Deuterated Silane (SiD4) is out. Bottle delivery delayed from vendor - see email for updates. // John d 23:10, 4 June 2022 (PDT)
New EBL Rates
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
Industrial Users: $405/hour
UC Academic Users: $126/hour
Non-UC Academic Users: $150/hour
UCSB CNSI Incubator USers: $260/hour
//Thibeault 12:21, 9 December 2021 (PST)