Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(lab card/iris access, Symmetry app and updates)
(removed qhitespac and internal comments (since vraj's script was pushing them to the bottom, instead of top where they used to be for human-readable instructions)))
Line 1: Line 1:
<startfeed />
<startfeed />

=====Job Opening: Process Engineer=====
=====Job Opening: Process Engineer=====
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
Line 21: Line 20:


//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)


<!--
<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 29: Line 26:
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->


<!---------- end of Equipment Status ------------>
<!---------DO NOT EDIT BELOW THIS LINE----------->
<!---------DO NOT EDIT BELOW THIS LINE----------->
<endfeed />
<endfeed />

Revision as of 21:52, 7 November 2023

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details. //Vraj Mehalana 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

ProbeStation scheduled IT maintenance

The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting //Vraj Mehalana 14:29, 3 November 2023 (PDT)

PECVD2 is down

We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again. //Vraj Mehalana 16:48, 31 October 2023 (PDT)

Wafer Bonder, (Suss SB6-8E)

The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.

//Vraj Mehalana 09:59, 20 September 2023 (PDT)