Template:Announcements: Difference between revisions
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
=====ASML Stepper #3: Down===== |
=====ASML Stepper #3: Down===== |
||
The new CPU board we need is being shipped from overseas - will update when we have an ETA. |
The new CPU board we need is being shipped from overseas - will update when we have an ETA. |
||
//[[User:John_d|Demis D. John]] 17:17, 4 January 2024 (PST) |
// [[User:John_d|Demis D. John]] 17:17, 4 January 2024 (PST) |
||
=====DUV Flood: UP with new procedure===== |
=====DUV Flood: UP with new procedure===== |
Revision as of 01:17, 5 January 2024
ASML Stepper #3: Down
The new CPU board we need is being shipped from overseas - will update when we have an ETA. // Demis D. John 17:17, 4 January 2024 (PST)
DUV Flood: UP with new procedure
The new parts have been installed and the tool has been tested.
We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 3 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on its Wiki page:
[DUV_Flood_Expose_SOP_Rev_C.pdf] // User:John_d Demis D. John 16:41, 4 January 2024 (PST)
Stepper #1 (GCA 6300) - Scheduled Maintenance
The tool will be undergoing maintenance and be unavailable the following dates and times:
1-18-24 at 8:00am to 1-18-24 at 6:00pm
Please plan your processing activities accordingly.
Bill Millerski
//Vraj Mehalana 21:49, 21 December 2023 (PST)
Stepper #2 (GCA Autostep 200) - Scheduled Maintenance
The tool will be undergoing maintenance and be unavailable the following dates and times:
1-15-24 at 8:00am to 1-17-24 at 6:00pm
Please plan your processing activities accordingly.
//Vraj Mehalana 21:49, 21 December 2023 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Vraj Mehalana 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".
// John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)