=====JEOL JBX-6300FS===== |
||
JEOL have applied a temporary fix that after overnite testing has shown to be robust. A full fix will require new boards to arrive from Japan in about a week. |
|||
The issues still remain but the investigation is pointing to a couple of boards in an external control computer. JEOL service are running a test overnight to try isolate the issue. Hopefully more will be known in the morning. |
|||
So feel confident about using the tool in the interim. If any issues, let me know immediately.// [[User:John_d|Demis D. John]] 15:52, 6 August 2024 (PDT) |
|||
⚫ | |||
System down for now... |
|||
//[[User: |
An engineer will be here the week of Aug. 26th to begin repairs on the tool. // [[User:John_d|Demis D. John]] 15:52, 6 August 2024 (PDT) |
||
=====Unaxis ICP-PECVD Update===== |
=====Unaxis ICP-PECVD Update===== |
||
Line 13: | Line 14: | ||
//[[User:Mehalana v|Vraj Mehalana]] 16:26, 26 July 2024 (PDT) |
//[[User:Mehalana v|Vraj Mehalana]] 16:26, 26 July 2024 (PDT) |
||
=====Dicing Saw Service Visit===== |
|||
The annual PM on the tool has been completed. However, there is still the issue with the chuck not rotating a perfect 90 degrees after aligning the first angle, so you will still have to perform alignment for angle #2. ADT is looking into sending us a cal plate to try and rectify this as the first potential solution. |
|||
-Lee |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT) |
|||
=====Velion FIB Tool DOWN===== |
|||
Raith service have completed the source change, resolved the power supply and column alignment issues, and restored the Pt deposition capability to full capacity. With remote assistance from Raith I will run some calibrations and stability tests over the next few days. After that I will return the tool to general use towards the end of the week. |
|||
The new ion source is AuGeSi. We have no plans to return to GaBiLi for the foreseeable future. Please get in contact if you have any questions. |
|||
-Dan |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:23, 8 July 2024 (PDT) |
|||
=====ICP1 Down===== |
=====ICP1 Down===== |
||
Line 42: | Line 27: | ||
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
⚫ | |||
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
|||
<!-- |
<!-- |
Revision as of 22:52, 6 August 2024
JEOL JBX-6300FS
JEOL have applied a temporary fix that after overnite testing has shown to be robust. A full fix will require new boards to arrive from Japan in about a week. So feel confident about using the tool in the interim. If any issues, let me know immediately.// Demis D. John 15:52, 6 August 2024 (PDT)
Wafer Bonder, (Suss SB6-8E)
An engineer will be here the week of Aug. 26th to begin repairs on the tool. // Demis D. John 15:52, 6 August 2024 (PDT)
Unaxis ICP-PECVD Update
Unfortunately the shipment of repaired parts was significantly delayed. I will be installing them and testing on Tuesday. With any luck the system will be available Tuesday evening.
Tony
//Vraj Mehalana 16:26, 26 July 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)