Template:Announcements: Difference between revisions
(dektak xt notice) |
No edit summary |
||
Line 43: | Line 43: | ||
==== Oxford Cobra ICP Etch ==== |
==== Oxford Cobra ICP Etch ==== |
||
ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. |
ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. |
||
[[User:Silva|Silva]] 07:23, 25 January 2023 (PST) |
// [[User:Silva|Silva]] 07:23, 25 January 2023 (PST) |
||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
Revision as of 01:34, 26 January 2023
Important Announcements
Dektak XT in qualification
We have replaced the Dektak 6M with a new Dektak XT profilometer. We are currently qualifying the tool, we'll send an email when it's ready for training. // John d 10:39, 25 January 2023 (PST)
Blue-M oven: Down
BlueM down until further notice. Looking into blown fuse issues. // John d 15:37, 19 January 2023 (PST)
Stepper #1 GCA 6300: maintenance
This tool has been scheduled for maintenance and will be unavailable for the following dates/times:
1-23-23 12:00pm till 1-23-23 5:00pm 1-26-23 8:00am till 1-27-23 8:00am // John d 15:01, 19 January 2023 (PST)
Stepper #2 AUtostep200: maintenance
This tool has been scheduled for maintenance and will be unavailable for the following dates/times:
1-23-23 8:00am till 1-23-23 12:00pm 1-24-23 8:00am till 1-26-23 8:00am // John d 15:35, 19 January 2023 (PST)
Au Plating: DOWN
Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)
Oxford Cobra ICP Etch
ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. // Silva 07:23, 25 January 2023 (PST)