Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 7: Line 7:
The new parts have been installed and the tool has been tested.
The new parts have been installed and the tool has been tested.


We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 3 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on its Wiki page:
We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 3 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on its Wiki page.


[[https://wiki.nanofab.ucsb.edu/w/images/8/89/DUV_Flood_Expose_SOP_Rev_C.pdf DUV_Flood_Expose_SOP_Rev_C.pdf]]
[https://wiki.nanofab.ucsb.edu/w/images/8/89/DUV_Flood_Expose_SOP_Rev_C.pdf New SOP: DUV_Flood_Expose_SOP_Rev_C.pdf]
// [[User:John_d|Demis D. John]] 17:18, 4 January 2024 (PST)
// [[User:John_d|Demis D. John]] 17:18, 4 January 2024 (PST)



Revision as of 01:19, 5 January 2024

ASML Stepper #3: Down

The new CPU board we need is being shipped from overseas - will update when we have an ETA. // Demis D. John 17:17, 4 January 2024 (PST)

DUV Flood: UP with new procedure

The new parts have been installed and the tool has been tested.

We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 3 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on its Wiki page.

New SOP: DUV_Flood_Expose_SOP_Rev_C.pdf // Demis D. John 17:18, 4 January 2024 (PST)

Stepper #1 (GCA 6300) - Scheduled Maintenance

The tool will be undergoing maintenance and be unavailable the following dates and times:

1-18-24 at 8:00am to 1-18-24 at 6:00pm

Please plan your processing activities accordingly.

Bill Millerski

//Vraj Mehalana 21:49, 21 December 2023 (PST)

Stepper #2 (GCA Autostep 200) - Scheduled Maintenance

The tool will be undergoing maintenance and be unavailable the following dates and times:

1-15-24 at 8:00am to 1-17-24 at 6:00pm

Please plan your processing activities accordingly.

//Vraj Mehalana 21:49, 21 December 2023 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Vraj Mehalana 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".

// John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)