Template:Announcements

From UCSB Nanofab Wiki
Revision as of 14:36, 15 September 2020 by John d (talk | contribs) (power outage Sept 19th)
Jump to navigation Jump to search

Equipment Status


Lab Shutdown: Sept. 19-20

There will be a campus wide power outage starting next Saturday (9/19) at 9pm. The outage will go through late Sunday (9/20) morning (~11am).

The cleanroom will be closed starting at 5pm on Saturday (9/19). Cleanroom staff will send out an email once the lab is back up Sunday afternoon. Please plan accordingly. // John d 07:36, 15 September 2020 (PDT)

NanoFab COVID Response

Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.

Contact the Lab Director for more information.

The most recent COVID Protocols can be found at COVID-19_User_Policies.

// John d 15:00, 19 July 2020 (PDT)

New Tool Installations

See the News Feed for info on two upcoming tool installations! We have a Raith Velion FIB and a Heidelberg MLA150 Maskless Aligner on the way.

// John d 17:48, 2 June 2020 (PDT)

Unaxis ICP-PECVD

The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.

// Thibeault 14:22, 26 March 2020 (PDT)