ASML Up
System is fully calibrated and ready to use. We are running a newer computer, so we expect there to be some differences.
Old jobs have been copied over, software options restored, and all old Jobs can be run/edited without issue.
Nanofiles sync & JobCreator functionality will be restored in the next 2 weeks.
// John d 09:44, 28 June 2022 (PDT)
Face-Masks Optional as of June 13
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.
We will still provide masks at the metal table in front of the cleanroom entry. See the UCSB announcement at this link.
See the full policies at COVID-19_User_Policies // John d 11:20, 13 June 2022 (PDT)
PureStrip Bath Heater UP
The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has been replaced, it is ready for use. // John d 08:29, 21 June 2022 (PDT)
Unaxis-Dep: Up
New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good. Films are ready to use. // John d 10:11, 17 June 2022 (PDT)
Gasonics Down
Leak in main chamber, tool is down. // John d 14:35, 27 May 2022 (PDT)
New EBL Rates
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
Industrial Users: $405/hour
UC Academic Users: $126/hour
Non-UC Academic Users: $150/hour
UCSB CNSI Incubator USers: $260/hour
//Thibeault 12:21, 9 December 2021 (PST)