Template:Announcements

From UCSB Nanofab Wiki
Revision as of 14:52, 6 June 2022 by John d (talk | contribs) (ASML down - TCU)
Jump to navigation Jump to search

Important Announcements


ASML Down: TCU failure

Temperature Control Unit is shutting off every ~6hr, tool is down. Working with ASML to remedy. // John d 07:52, 6 June 2022 (PDT)

Plating Bench: Down 6/7 9a-12n

The plating bench in Bay 4 will be unavailable on Wednesday, 6/7/22 from 9am-noon. Please plan accordingly. // John d 12:13, 1 June 2022 (PDT)

Masks Mandatory: May 27-June 12

UCSB has reinstituted a mandatory mask mandate for all indoor spaces on campus.

The mandate begins May 27, and extends through June 12.

See the full announcement at this link.

We will provide masks at the metal table in front of the cleanroom entry.

See the full policies at COVID-19_User_Policies // John d 15:48, 26 May 2022 (PDT)

Unaxis-Dep: Down

Deuterated Silane (SiD4) is out. Bottle delivery delayed from vendor - see email for updates. // John d 23:10, 4 June 2022 (PDT)

New EBL Rates

Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:

Industrial Users: $405/hour

UC Academic Users: $126/hour

Non-UC Academic Users: $150/hour

UCSB CNSI Incubator USers: $260/hour

//Thibeault 12:21, 9 December 2021 (PST)