Template:Announcements
Important Announcements
Masks Optional as of June 13
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.
We will still provide masks at the metal table in front of the cleanroom entry. See the UCSB announcement at this link.
See the full policies at COVID-19_User_Policies // John d 11:20, 13 June 2022 (PDT)
PureStrip Bath Heater DOWN
The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has failed, do not attempt to use until we replace it. // John d 16:09, 10 June 2022 (PDT)
ASML Down
Hardware delivery ETA updated to June 17th. We’ll schedule an ASML engineer on-site visit to perform the installation, verification and system calibrations. We may have been able to revive the TCU, but have another electrical hardware failure that requires a new part from ASML. // John d 12:54, 9 June 2022 (PDT)
Gasonics Down
Leak in main chamber, tool is down. // John d 14:35, 27 May 2022 (PDT)
Unaxis-Dep: Down
Deuterated Silane (SiD4) is out. Bottle expected to be delivered on Monday 6/13. // John d 16:10, 10 June 2022 (PDT)
New EBL Rates
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
Industrial Users: $405/hour
UC Academic Users: $126/hour
Non-UC Academic Users: $150/hour
UCSB CNSI Incubator USers: $260/hour
//Thibeault 12:21, 9 December 2021 (PST)