Template:Announcements
Important Announcements
Unaxis-Dep: Up
New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good. Films are ready to use. // John d 10:11, 17 June 2022 (PDT)
ASML Down
We're in the process of installing the new computer and other hardware. Barring unforseen issues, we expect to have the system running and calibrated by Thursday or Friday.
We are installing a new computer on the system. We have all user jobs backed up, so no user data will be lost in the transfer. However, the sync scripts for python ASML-JobCreator scripting will need to be re-written, so the automatic syncing for JobCreator will be unavailable until I rewrite those. // John d 07:48, 21 June 2022 (PDT)
Face-Masks Optional as of June 13
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.
We will still provide masks at the metal table in front of the cleanroom entry. See the UCSB announcement at this link.
See the full policies at COVID-19_User_Policies // John d 11:20, 13 June 2022 (PDT)
PureStrip Bath Heater DOWN
The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has failed, do not attempt to use until we replace it. // John d 16:09, 10 June 2022 (PDT)
Gasonics Down
Leak in main chamber, tool is down. // John d 14:35, 27 May 2022 (PDT)
New EBL Rates
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
Industrial Users: $405/hour
UC Academic Users: $126/hour
Non-UC Academic Users: $150/hour
UCSB CNSI Incubator USers: $260/hour
//Thibeault 12:21, 9 December 2021 (PST)