Template:Announcements
Year End Shutdown
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. //Vraj Mehalana 15:13, 5 December 2023 (PST) The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.
//Vraj Mehalana 14:39, 16 November 2023 (PST)
PECVD2 is up for SiO2 and Std SiN Only
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20
// Thibeault 09:10, 16 November 2023 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Vraj Mehalana 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".
// John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
//Vraj Mehalana 09:59, 20 September 2023 (PDT)
Sputter #3 (AJA) - Sputter 3 Si target is consumed
Do not try to use the Si target, it is completely consumed. I am going to install a new target Friday morning.
Tony //Vraj Mehalana 15:13, 6 December 2023 (PST)