+ | =====Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis |
||
− | <!-- Description of the RSS feed --> |
||
− | ''UCSB NanoFab Announcements'' |
||
⚫ | |||
− | '''How to add new news items''' |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 13:42, 9 May 2024 (PDT) |
||
⚫ | |||
+ | =====MA6 TSA is down - Update===== |
||
⚫ | |||
+ | After working with our FSE over the phone, we feel the culprit is a bound up Y axis motor for the top side microscope. Unfortunately, this axis is at the bottom of the microscope assembly and will require the removal of both the X and Z axis sub assemblies. I am awaiting proper instructions on how to dismantle all of this and the FSE is also checking with some of their contacts to see if there is an easier solution. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | ===== EBeam #4: Down for Upgrades ===== |
||
− | Down through the week of Monday the 12th, installing new HV/Sweep controller. |
||
− | Users will need retraining on these new components once the system is back up. |
||
⚫ | |||
+ | I have been asked by a few users about using the tool in TSA mode for exposures that do not require alignment even through the topside microscope is not functional. I have just tested the tool in TSA mode and it will work like this, just note that the topside microscope will not come down. |
||
⚫ | |||
− | We found an issue that most likely contributed to the high particle |
||
− | count. We will verify the particle count on Monday. Until then, I will |
||
− | release the system for use, but please assume the particle count is |
||
− | still high if running the tool before further notice. I will send out |
||
− | an email with the updated particle count Monday afternoon. |
||
⚫ | |||
+ | -Lee |
||
− | ===== Stepper #2 Maintenance ===== |
||
− | The vendor will be servicing the GCA Autostep on Thursday March 15, 2018 at 8:00AM. The system will be up and running later that afternoon. Please plan your process accordingly. |
||
⚫ | |||
− | ===== Stepper #1 Maintenance Complete ===== |
||
− | 3C is finished with the maintenance on the 6300 and the system is |
||
− | ready to use. Please let us know immediately if you encounter any |
||
− | issues. |
||
− | // [[User:John d|Posted:]] 11:04, 16 March 2018 (PDT) |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:41, 13 May 2024 (PDT) |
||
− | ===== Gasonics: Up ===== |
||
− | The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned. |
||
− | // [[User:John d|Posted:]] 10:14, 12 February 2018 (PST) |
||
− | ===== |
+ | =====Velion FIB Tool DOWN===== |
+ | Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
||
− | UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. |
||
− | // [[User:John d|Posted:]] 13:47, 12 February 2018 (PST) |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT) |
||
⚫ | |||
+ | |||
− | <!----------------------------------------------> |
||
+ | =====ASML optics replacement May 20th-22nd===== |
||
+ | We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e. |
||
+ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 09:40, 9 May 2024 (PDT) |
||
+ | |||
⚫ | |||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
⚫ | |||
+ | |||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
⚫ | |||
+ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
+ | |||
⚫ | |||
+ | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
+ | In order for your post to show up correctly, you need to: |
||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
⚫ | |||
+ | ====== HOW TO ADD ITEMS ====== |
||
+ | * You can copy/paste the example below for a new news item. |
||
⚫ | |||
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | |||
+ | |||
+ | ******** EXAMPLE OF A NEW POST ******** |
||
+ | |||
+ | ===== NanoFab making LN2 icecream ===== |
||
+ | Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
+ | |||
+ | ************* (end of example) ************** |
||
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
⚫ |
Latest revision as of 14:41, 13 May 2024
Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair
I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis
//Vraj Mehalana 13:42, 9 May 2024 (PDT)
MA6 TSA is down - Update
After working with our FSE over the phone, we feel the culprit is a bound up Y axis motor for the top side microscope. Unfortunately, this axis is at the bottom of the microscope assembly and will require the removal of both the X and Z axis sub assemblies. I am awaiting proper instructions on how to dismantle all of this and the FSE is also checking with some of their contacts to see if there is an easier solution.
I have been asked by a few users about using the tool in TSA mode for exposures that do not require alignment even through the topside microscope is not functional. I have just tested the tool in TSA mode and it will work like this, just note that the topside microscope will not come down.
-Lee
//Vraj Mehalana 14:41, 13 May 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ASML optics replacement May 20th-22nd
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
//Vraj Mehalana 09:40, 9 May 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)