Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted ASML 4/26, added HIMT 4/29)
(Feed Appended)
 
(279 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
<!--feedBurner name="UCSBNanofab-Announcements" /-->
+
=====Unaxis ICP-PECVD is DOWN=====
<!-- Description of the RSS feed -->
+
RF1 continues to be a problem. I will start the process of elimination from a hardware point of view Monday. Once I resolve the hardware issue our Process group will be exclusively running the system for about a week. During this time we will NOT be allowing anyone else to use the system. Sorry for the inconvenience.
'''''Equipment Status'''''
+
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 22 September 2023 (PDT)
----
+
=====Wafer Bonder, (Suss SB6-8E)=====
 +
The top heater has failed.  We are currently in the process of trying to source a new heater.  we will send out an email once I have an update.
 +
 
 +
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 +
 
 +
=====Dicing Saw (ADT) Upgrade 10/9=====
 +
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software.
 +
I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes.
 +
//[[User:Mehalana v|Vraj Mehalana]] 10:33, 6 September 2023 (PDT)
 +
 
 +
=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
 +
The tool has been scheduled for maintenance on 9-28-23 from 8:00am to 5:00pm.  During this time the tool will be unavailable for use.  Please plan your lab activities accordingly.
 +
//[[User:Mehalana v|Vraj Mehalana]] 10:13, 6 September 2023 (PDT)
 +
 
 +
=====EVG is up=====
 +
The work on the tool has been completed and it is available for use without Staff supervision. We made 30  runs on the tool without any high reflected power issues, but the possibility still remains that it could happen.  System available for use.
 +
//[[User:Mehalana v|Vraj Mehalana]] 14:16, 22 September 2023 (PDT)
 +
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
+
In order for your post to show up correctly, you need to:
Please use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
+
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
Use FOUR tilde's to insert your signature at the end of your post: ~~~~
+
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
 
===== MLA150 Service: Wed Apr 29th =====
 
A HIMT Engineer will be here on Thurs Apr. 29th to continue working on the focus issues. Wed reservations may be cancelled to allow for the service visit.
 
// [[User:John d|John d]] 22:44, 28 April 2021 (PDT)
 
 
===== ASML Service: May 17-21 =====
 
ASML Engineers will be servicing Stepper #3 from Monday May 17th to Friday May 21st, for a full hose-replacement service.  The Tool will be unavailable during this whole time, please plan your fabrication accordingly.
 
 
// [[User:John d|John d]] 07:32, 20 April 2021 (PDT)
 
 
===== Weekly Testing strongly urged for UCSB Students/Staff =====
 
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
 
 
Weekly recurring appointments can be made at the Student Health website:
 
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
 
 
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
 
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)
 
 
===== NanoFab COVID Protocols =====
 
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
 
 
Contact the [[Brian Thibeault|Lab Director]] for more information.
 
 
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
 
 
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
 
  
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
<!---------------------------------------------->
+
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
<!--------------------------------------------
 
+
====== HOW TO ADD ITEMS ======
 
 
 
 
 
 
====== HOW TO ADD NEWS ITEMS ======
 
 
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way.  (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way.  (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.  
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.  
 
* Use double-slash:  //  at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash:  //  at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.  
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.  
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  
Line 67: Line 52:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
// ~~~~
+
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
  
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 14:17, 22 September 2023

Unaxis ICP-PECVD is DOWN

RF1 continues to be a problem. I will start the process of elimination from a hardware point of view Monday. Once I resolve the hardware issue our Process group will be exclusively running the system for about a week. During this time we will NOT be allowing anyone else to use the system. Sorry for the inconvenience. //Vraj Mehalana 14:17, 22 September 2023 (PDT)

Wafer Bonder, (Suss SB6-8E)

The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.

//Vraj Mehalana 09:59, 20 September 2023 (PDT)

Dicing Saw (ADT) Upgrade 10/9

The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software. I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes. //Vraj Mehalana 10:33, 6 September 2023 (PDT)

Stepper #1 (GCA 6300) Scheduled Maintenance

The tool has been scheduled for maintenance on 9-28-23 from 8:00am to 5:00pm. During this time the tool will be unavailable for use. Please plan your lab activities accordingly. //Vraj Mehalana 10:13, 6 September 2023 (PDT)

EVG is up

The work on the tool has been completed and it is available for use without Staff supervision. We made 30 runs on the tool without any high reflected power issues, but the possibility still remains that it could happen. System available for use. //Vraj Mehalana 14:16, 22 September 2023 (PDT)