Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ISO spray updat,e deleted ASML maint.)
 
(317 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====Year End Shutdown=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm.
<!-- Description of the RSS feed -->
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 15:13, 5 December 2023 (PST)
'''''Equipment Status'''''
 
  +
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.
----
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 14:39, 16 November 2023 (PST)
Please use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
Use FOUR tilde's to insert your signature at the end of your post: ~~~~
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
   
===== New COVID Protocols =====
+
=====PECVD2 is up for SiO2 and Std SiN Only=====
  +
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first.
ISO Spray is no longer required inside the lab. Masks are still required.
 
  +
Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20
Shifts have been eliminated as of 5/15/21.
 
   
  +
// [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST)
Read the latest policies on the [https://wiki.nanotech.ucsb.edu/wiki/COVID-19_User_Policies '''COVID-19 User Policies'''] page.
 
   
  +
=====Job Opening: Process Engineer=====
// [[User:John d|John d]] 13:46, 14 June 2021 (PDT)
 
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
===== Weekly Testing strongly urged for UCSB Students/Staff =====
 
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
 
   
  +
=====Lab Access Changes: Symmetry App=====
Weekly recurring appointments can be made at the Student Health website:
 
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
 
   
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
 
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)
 
   
===== NanoFab COVID Protocols =====
+
=====Wafer Bonder, (Suss SB6-8E)=====
  +
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
Contact the [[Brian Thibeault|Lab Director]] for more information.
 
  +
=====Sputter #3 (AJA) - Sputter 3 Si target is consumed=====
  +
Do not try to use the Si target, it is completely consumed. I am going to install a new target Friday morning.
   
  +
Tony
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 15:13, 6 December 2023 (PST)
 
 
<!--
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
 
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
  +
In order for your post to show up correctly, you need to:
 
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
<!---------- end of Equipment Status ------------>
 
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
<!---------------------------------------------->
 
 
-->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
 
 
 
====== HOW TO ADD NEWS ITEMS ======
 
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
   
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
   
   
Line 66: Line 58:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 15:13, 6 December 2023

Year End Shutdown

We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. //Vraj Mehalana 15:13, 5 December 2023 (PST) The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.

//Vraj Mehalana 14:39, 16 November 2023 (PST)

PECVD2 is up for SiO2 and Std SiN Only

We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20

// Thibeault 09:10, 16 November 2023 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Vraj Mehalana 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".

// John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.

//Vraj Mehalana 09:59, 20 September 2023 (PDT)

Sputter #3 (AJA) - Sputter 3 Si target is consumed

Do not try to use the Si target, it is completely consumed. I am going to install a new target Friday morning.

Tony //Vraj Mehalana 15:13, 6 December 2023 (PST)