+ | =====Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair===== |
||
⚫ | |||
+ | I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis |
||
− | The new CPU board we need is being shipped from overseas - will update when we have an ETA. |
||
⚫ | |||
⚫ | |||
− | =====DUV Flood: UP with new procedure===== |
||
+ | =====MA6 TSA is down - Update===== |
||
− | The new parts have been installed and the tool has been tested. |
||
+ | Multiple attempts to unbind the Y axis motor have been unsuccessful. The motor may have failed so I am waiting to hear back on Suss about availability and lead time. |
||
+ | If you are in desperate need of using the tool with the topside microscope, CNSI's Quantum Structures Facility has one available for use: |
||
− | We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 3 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on its Wiki page: |
||
+ | https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication |
||
− | [[https://wiki.nanofab.ucsb.edu/w/images/8/89/DUV_Flood_Expose_SOP_Rev_C.pdf DUV_Flood_Expose_SOP_Rev_C.pdf]] |
||
− | // [[User:John_d|Demis D. John]] 17:18, 4 January 2024 (PST) |
||
+ | -Lee |
||
− | =====Stepper #1 (GCA 6300) - Scheduled Maintenance===== |
||
− | The tool will be undergoing maintenance and be unavailable the following dates and times: |
||
⚫ | |||
− | 1-18-24 at 8:00am to 1-18-24 at 6:00pm |
||
+ | =====Velion FIB Tool DOWN===== |
||
− | Please plan your processing activities accordingly. |
||
+ | Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
||
⚫ | |||
− | Bill Millerski |
||
+ | =====ASML optics replacement May 20th-22nd===== |
||
⚫ | |||
+ | We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 09:40, 9 May 2024 (PDT) |
||
− | ===== Stepper #2 (GCA Autostep 200) - Scheduled Maintenance===== |
||
− | The tool will be undergoing maintenance and be unavailable the following dates and times: |
||
⚫ | |||
− | 1-15-24 at 8:00am to 1-17-24 at 6:00pm |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
− | |||
⚫ | |||
− | Please plan your processing activities accordingly. |
||
− | |||
⚫ | |||
− | |||
− | =====Job Opening: Process Engineer===== |
||
− | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
− | |||
⚫ | |||
=====Lab Access Changes: Symmetry App===== |
=====Lab Access Changes: Symmetry App===== |
||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
− | |||
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
||
=====Wafer Bonder, (Suss SB6-8E)===== |
=====Wafer Bonder, (Suss SB6-8E)===== |
||
− | SUSS |
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
Latest revision as of 21:29, 16 May 2024
Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair
I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis
//Vraj Mehalana 13:42, 9 May 2024 (PDT)
MA6 TSA is down - Update
Multiple attempts to unbind the Y axis motor have been unsuccessful. The motor may have failed so I am waiting to hear back on Suss about availability and lead time.
If you are in desperate need of using the tool with the topside microscope, CNSI's Quantum Structures Facility has one available for use:
https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication
-Lee
//Vraj Mehalana 14:41, 13 May 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ASML optics replacement May 20th-22nd
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
//Vraj Mehalana 09:40, 9 May 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)