+ | ===== Stepper #2 AutoStep: Down ===== |
+ | We lost a motor in the mask aligner. Vendor is being contacted for repair. We will send an email out once we have more |
||
− | Plasmatherm will be here Monday April 16, 2018 to upgrade the system |
||
+ | information. |
||
− | software. The user interface will be completely different from what it |
||
⚫ | |||
− | is now. All users will be disqualified and will need to be retrained |
||
+ | |||
− | to access the system through Signupmonkey. We will schedule training |
||
+ | ===== PECVD#2 Upgrades in progress, Retraining required ===== |
||
− | sessions for the middle of next week. |
||
+ | Plasmatherm is still upgrading the system software. The user interface will be completely different from the previous software, so all users will be disqualified and will need to be retrained to access the system through Signupmonkey. We will schedule training sessions once the upgrade is complete. |
||
⚫ | |||
⚫ | |||
===== RIE#5 Up ===== |
===== RIE#5 Up ===== |
||
Line 41: | Line 42: | ||
One of the DB files keeps getting corrupted. We've restored the system back to the backup created yesterday afternoon and the saw is up and running. Looking into a longer term fix. If you created a new recipe within the last 5 days you may need to re-create it. |
One of the DB files keeps getting corrupted. We've restored the system back to the backup created yesterday afternoon and the saw is up and running. Looking into a longer term fix. If you created a new recipe within the last 5 days you may need to re-create it. |
||
// [[User:John d|John d]] 21:43, 27 March 2018 (PDT) |
// [[User:John d|John d]] 21:43, 27 March 2018 (PDT) |
||
− | |||
− | ===== EBeam #4: Re-Training Required ===== |
||
− | The upgrade is complete and working well. All users will be required |
||
− | to be trained again. The high voltage, sweep and turret controls are |
||
− | all new. |
||
⚫ | |||
===== Cary 500 Down ===== |
===== Cary 500 Down ===== |
Revision as of 12:51, 24 April 2018
UCSB NanoFab Announcements
Stepper #2 AutoStep: Down
We lost a motor in the mask aligner. Vendor is being contacted for repair. We will send an email out once we have more information. // John d 12:51, 24 April 2018 (PDT)
PECVD#2 Upgrades in progress, Retraining required
Plasmatherm is still upgrading the system software. The user interface will be completely different from the previous software, so all users will be disqualified and will need to be retrained to access the system through Signupmonkey. We will schedule training sessions once the upgrade is complete. // John d 12:51, 24 April 2018 (PDT)
RIE#5 Up
RIE #5 is up for use, including SiCl4. // John d 11:45, 20 April 2018 (PDT)
ADT Dicing Saw: Intermittent Software Issue
One of the DB files keeps getting corrupted. We've restored the system back to the backup created yesterday afternoon and the saw is up and running. Looking into a longer term fix. If you created a new recipe within the last 5 days you may need to re-create it. // John d 21:43, 27 March 2018 (PDT)
Cary 500 Down
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)