Difference between revisions of "Template:Announcements"
(many updates) |
|||
Line 8: | Line 8: | ||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
<!------------- Announcements ----------------> |
<!------------- Announcements ----------------> |
||
− | ===== Solvent Bench Bay 7 - Bath |
+ | ===== Solvent Bench Bay 7 - Bath & Bench up ===== |
+ | The Heated bath in bay 7 is up and ready to use. It is at 80 c now and has a new auto refill as well as a manual fill. Mike Day will be inspecting the bath every morning for water level, contaminated water as well as feed back from all you guys. We know there will most likely be a little fine tuning, So please give Mike Day your feed back. |
||
− | Heated bath is still down until auto-water fill is set up. Rest of bench is OK for use. |
||
− | //[[User: |
+ | // [[User:John d|John d]] 17:26, 30 May 2018 (PDT) |
− | |||
− | ===== Plasma Therm DSEIII DOWN ===== |
||
− | Plasma Therm DSEII is down due to wafer stuck in chamber. Will be resolved Tuesday morning at latest. |
||
− | //[[User:Thibeault|Thibeault]] 10:41, 26 May 2018 (PDT) |
||
===== RIE#2 Up ===== |
===== RIE#2 Up ===== |
||
RIE2 RF issues fixed. |
RIE2 RF issues fixed. |
||
− | //[[User:Thibeault|Thibeault]] 14:52, 26 May 2018 (PDT) |
+ | // [[User:Thibeault|Thibeault]] 14:52, 26 May 2018 (PDT) |
===== RIE#5: No SiCl4 ===== |
===== RIE#5: No SiCl4 ===== |
||
Line 25: | Line 21: | ||
// [[User:John d|John d]] 21:40, 14 May 2018 (PDT) |
// [[User:John d|John d]] 21:40, 14 May 2018 (PDT) |
||
− | ===== FEI SEM |
+ | ===== FEI SEM repaired ===== |
+ | Door replaced, system up. |
||
− | Door issue is still nor resolved. Down until further notice. |
||
− | // [[User: |
+ | // [[User:John d|John d]] 17:26, 30 May 2018 (PDT) |
===== PECVD#2 is Up ===== |
===== PECVD#2 is Up ===== |
Revision as of 17:26, 30 May 2018
UCSB NanoFab Announcements
Solvent Bench Bay 7 - Bath & Bench up
The Heated bath in bay 7 is up and ready to use. It is at 80 c now and has a new auto refill as well as a manual fill. Mike Day will be inspecting the bath every morning for water level, contaminated water as well as feed back from all you guys. We know there will most likely be a little fine tuning, So please give Mike Day your feed back. // John d 17:26, 30 May 2018 (PDT)
RIE#2 Up
RIE2 RF issues fixed. // Thibeault 14:52, 26 May 2018 (PDT)
RIE#5: No SiCl4
We should have a new cylinder of SiCl4 in two weeks. Until then we are out of SiCl4. // John d 21:40, 14 May 2018 (PDT)
FEI SEM repaired
Door replaced, system up. // John d 17:26, 30 May 2018 (PDT)
PECVD#2 is Up
The Plasma Therm Cortex software update is complete, and the system is operational. Standard recipes requalified. Particle counts are now much lower and around historical levels. All users need retraining on the new software. Contact Mike Silva for training. // Thibeault 17:25, 24 May 2018 (PDT)