=====Year End Shutdown===== |
|||
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. |
|||
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
|||
=====Dicing Saw (ADT) Upgrade 10/9 - PLEASE READ===== |
|||
⚫ | |||
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software. |
|||
I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes. |
|||
⚫ | |||
===== |
=====PECVD2 is up for SiO2 and Std SiN Only===== |
||
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. |
|||
The tool has been scheduled for maintenance on 9-28-23 from 8:00am to 5:00pm. During this time the tool will be unavailable for use. Please plan your lab activities accordingly. |
|||
Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20 // [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST) |
|||
⚫ | |||
===== |
=====Job Opening: Process Engineer===== |
||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
|||
JEOL has finished will the install and the SEM is available to use if you've received training on SEM #1. |
|||
//[[User: |
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT) |
||
===== |
=====Lab Access Changes: Symmetry App===== |
||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything. |
|||
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
|||
Runs will still require Staff supervision until then. |
|||
⚫ | |||
=====ProbeStation scheduled IT maintenance===== |
|||
The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting |
|||
⚫ | |||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update. |
|||
⚫ | |||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
Line 25: | Line 32: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
|||
<!------------- Equipment Status ----------------> |
|||
<!---------- end of Equipment Status ------------> |
|||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Revision as of 05:09, 17 November 2023
Year End Shutdown
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm.
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. //Vraj Mehalana 14:39, 16 November 2023 (PST)
PECVD2 is up for SiO2 and Std SiN Only
We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20 // Thibeault 09:10, 16 November 2023 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details. //Vraj Mehalana 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
ProbeStation scheduled IT maintenance
The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting //Vraj Mehalana 14:29, 3 November 2023 (PDT)
Wafer Bonder, (Suss SB6-8E)
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
//Vraj Mehalana 09:59, 20 September 2023 (PDT)