Vacuum Deposition Recipes: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
changed all sputter 3-5 R3s into R4s because I'm assuming we can have control with lookaheads |
R4s to Ebeam1 and 2 |
||
| Line 279: | Line 279: | ||
|- |
|- |
||
! bgcolor="#d0e7ff" align="center" |C |
! bgcolor="#d0e7ff" align="center" |C |
||
| bgcolor="#eeffff" align="center" |[[E-Beam Evaporation Recipes#E-Beam 1 .28Sharon.29| |
| bgcolor="#eeffff" align="center" |[[E-Beam Evaporation Recipes#E-Beam 1 .28Sharon.29|R4]] |
||
| bgcolor="#eeffff" align="center" | |
| bgcolor="#eeffff" align="center" | |
||
| bgcolor="#eeffff" align="center" | |
| bgcolor="#eeffff" align="center" | |
||
| Line 365: | Line 365: | ||
! bgcolor="#d0e7ff" align="center" |CeO<sub>2</sub> |
! bgcolor="#d0e7ff" align="center" |CeO<sub>2</sub> |
||
| bgcolor="#eeffff" |<br> |
| bgcolor="#eeffff" |<br> |
||
| bgcolor="#eeffff" |[[E-Beam Evaporation Recipes#E-Beam 2 .28Custom.29| |
| bgcolor="#eeffff" |[[E-Beam Evaporation Recipes#E-Beam 2 .28Custom.29|R4]] |
||
| bgcolor="#eeffff" |<br> |
| bgcolor="#eeffff" |<br> |
||
| bgcolor="#eeffff" |<br> |
| bgcolor="#eeffff" |<br> |
||
| Line 637: | Line 637: | ||
! bgcolor="#d0e7ff" align="center" |ITO |
! bgcolor="#d0e7ff" align="center" |ITO |
||
| bgcolor="#eeffff" |<br> |
| bgcolor="#eeffff" |<br> |
||
| bgcolor="#eeffff" |[[E-Beam Evaporation Recipes#E-Beam 2 .28Custom.29| |
| bgcolor="#eeffff" |[[E-Beam Evaporation Recipes#E-Beam 2 .28Custom.29|R4]] |
||
| bgcolor="#eeffff" |<br> |
| bgcolor="#eeffff" |<br> |
||
| bgcolor="#eeffff" |<br> |
| bgcolor="#eeffff" |<br> |
||
Revision as of 21:05, 14 August 2025
Process Control Data
See linked page for process control data (calibration data over time, such as dep. rate, refractive index, stress etc.) over time, for a selection of highly used tools/films.
Deposition Tools/Materials Table
Process Maturity Ranking
R6- most mature process with regular calibrations recorded on SPC charts.- …
R1- least mature - "possible" but you'll have to figure it out.
The Key/Legend for this table's R1...R6 values is at the bottom of the page.
Process Ranking Table
Processes in the table above are ranked by their "Process Maturity Level" as follows:
| Process Level | Description of Process Level Ranking | ||||||||||
| A | Process Allowed and materials available but never done | ||||||||||
| R1 | Process has been ran at least once | ||||||||||
| R2 | Process has been ran and/or procedure is documented or/and data available | ||||||||||
| R3 | Process has been ran, procedure is documented, and data is available | ||||||||||
| R4 | Process has a documented procedure with regular (≥4x per year) data or lookahead/in-Situ control available | ||||||||||
| R5 | Process has a documented procedure with regular (≥4x per year) data and lookahead/in-Situ control available | ||||||||||
| R6 | Process has a documented procedure, regular ( ≥4x per year) data, and control charts/limits available | ||||||||||