Vacuum Deposition Recipes: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
Updating Ti, Au, Cr, Ni to R6 for Ebeam1 |
Bringing Sputter 5 Ti, Al, Cr to R5 (once the details are put on the wiki, we will update these all to R6) |
||
| Line 98: | Line 98: | ||
|[[Sputtering Recipes|R1]] |
|[[Sputtering Recipes|R1]] |
||
|[[Sputtering Recipes|R3]] |
|[[Sputtering Recipes|R3]] |
||
|[[Sputtering Recipes| |
|[[Sputtering Recipes|R5]] |
||
|R1 |
|R1 |
||
|[[Thermal Evaporation Recipes#Thermal Evaporator 1|R3]] |
|[[Thermal Evaporation Recipes#Thermal Evaporator 1|R3]] |
||
| Line 404: | Line 404: | ||
|[https://wiki.nanotech.ucsb.edu/w/index.php?title=Sputtering_Recipes#Sputter_3_.28AJA_ATC_2000-F.29 R3] |
|[https://wiki.nanotech.ucsb.edu/w/index.php?title=Sputtering_Recipes#Sputter_3_.28AJA_ATC_2000-F.29 R3] |
||
|<br> |
|<br> |
||
|{{Rl|Sputtering_Recipes|Sputter_5_.28AJA_ATC_2200-V.29| |
|{{Rl|Sputtering_Recipes|Sputter_5_.28AJA_ATC_2200-V.29|R5}} |
||
|<br> |
|<br> |
||
|[[Thermal Evaporation Recipes#Thermal Evaporator 1|R3]] |
|[[Thermal Evaporation Recipes#Thermal Evaporator 1|R3]] |
||
| Line 1,254: | Line 1,254: | ||
| bgcolor="#eeffff" |[[Sputtering Recipes|R3]] |
| bgcolor="#eeffff" |[[Sputtering Recipes|R3]] |
||
| bgcolor="#eeffff" |[[Sputtering Recipes|R3]] |
| bgcolor="#eeffff" |[[Sputtering Recipes|R3]] |
||
| bgcolor="#eeffff" |[[Sputtering Recipes| |
| bgcolor="#eeffff" |[[Sputtering Recipes|R5]] |
||
| bgcolor="#eeffff" |R1 |
| bgcolor="#eeffff" |R1 |
||
| bgcolor="#eeffff" |<br> |
| bgcolor="#eeffff" |<br> |
||
Revision as of 17:09, 12 August 2025
Process Control Data
See linked page for process control data (calibration data over time, such as dep. rate, refractive index, stress etc.) over time, for a selection of highly used tools/films.
Deposition Tools/Materials Table
Process Maturity Ranking
R6- most mature process with regular calibrations recorded on SPC charts.- …
R1- least mature - "possible" but you'll have to figure it out.
The Key/Legend for this table's R1...R6 values is at the bottom of the page.
Process Ranking Table
Processes in the table above are ranked by their "Process Maturity Level" as follows:
| Process Level | Description of Process Level Ranking | ||||||||||
| A | Process Allowed and materials available but never done | ||||||||||
| R1 | Process has been ran at least once | ||||||||||
| R2 | Process has been ran and/or procedure is documented or/and data available | ||||||||||
| R3 | Process has been ran, procedure is documented, and data is available | ||||||||||
| R4 | Process has a documented procedure with regular (≥4x per year) data or lookahead/in-Situ control available | ||||||||||
| R5 | Process has a documented procedure with regular (≥4x per year) data and lookahead/in-Situ control available | ||||||||||
| R6 | Process has a documented procedure, regular ( ≥4x per year) data, and control charts/limits available | ||||||||||