Template:Announcements: Difference between revisions
Mehalana v (talk | contribs) |
|||
Line 29: | Line 29: | ||
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST) |
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST) |
||
=====EBeam3 |
=====EBeam3 Transfer Arm Upgrade - Postponed===== |
||
The |
The Transfer Arm upgrade has been postponed again, this time due to motor driver compatibility issues. |
||
I am waiting to hear back from the manufacturer so at this time I can not reschedule yet. |
|||
I will send another notification when everything has been worked out, and I am ready to schedule the installation. |
|||
The work is now scheduled for 2/21/24 - 2/22/24. |
|||
Please plan accordingly. |
|||
//[[User:John_d|Demis D. John]] 11:56, 13 February 2024 (PST) |
//[[User:John_d|Demis D. John]] 11:56, 13 February 2024 (PST) |
||
Revision as of 07:31, 17 February 2024
E-Beam #4 (CHA) - UP
Cryo replaced, system ready for use. //Demis D. John 13:58, 14 February 2024 (PST)
PECVD #2 is UP
The tool is up, intial film checks show same dep. rates as before. //Demis D. John 11:56, 13 February 2024 (PST)
RIE 5 is up
RIE 5 is up except for processes that use SiCl4.
//Vraj Mehalana 09:39, 30 January 2024 (PST)
Dry Etch, Si Deep RIE (PlasmaTherm DSEIII) - DSE Update
We received most of the chamber assembly replacement parts today. We are still waiting on the lamps and chamber o-rings which are scheduled to be delivered in the next couple of days. Once we have all the parts, we'll start to reassemble the chamber.
I'll send out an update in the next 2-3 days.
Thanks, //Vraj Mehalana 10:58, 5 February 2024 (PST)
ICP #1 is down - Update
Replacing the battery on the board did not resolve the tool issue.
Panasonic has located a replacement board for the tool. From what I gather they need to repair and test it and are hoping to have it ready to ship by the 16th. I'd like to add that there is the possibility that this will not resolve the issue but it is the best path forward at this point.
-Lee //Vraj Mehalana 09:39, 30 January 2024 (PST)
EBeam3 Transfer Arm Upgrade - Postponed
The Transfer Arm upgrade has been postponed again, this time due to motor driver compatibility issues.
I am waiting to hear back from the manufacturer so at this time I can not reschedule yet.
I will send another notification when everything has been worked out, and I am ready to schedule the installation.
//Demis D. John 11:56, 13 February 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".
// John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)