Template:Announcements: Difference between revisions
No edit summary |
No edit summary |
||
Line 11: | Line 11: | ||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
===== Nanofab Closure for Thanksgiving ===== |
|||
The Nanofab will be closed from Wed. Nov. 25 at 9pm until Sat. Nov. 28 at 5:30am in observance of the Thanksgiving holiday. Users are not permitted to enter the facility during these times. |
|||
[[User:Thibeault|Thibeault]] 21:38, 18 November 2020 (PST) |
|||
===== UCSB Flu Vaccination Mandate ===== |
===== UCSB Flu Vaccination Mandate ===== |
||
UCSB Students, Staff and Faculty are required to recieve a Flu Vaccine by Nov. 1st. <br>Please see the '''[[COVID-19_User_Policies#UCSB_Flu_Vaccination_Mandate|COVID19 Page]]''' for relevant links and information. |
UCSB Students, Staff and Faculty are required to recieve a Flu Vaccine by Nov. 1st. <br>Please see the '''[[COVID-19_User_Policies#UCSB_Flu_Vaccination_Mandate|COVID19 Page]]''' for relevant links and information. |
Revision as of 05:38, 19 November 2020
Equipment Status
Nanofab Closure for Thanksgiving
The Nanofab will be closed from Wed. Nov. 25 at 9pm until Sat. Nov. 28 at 5:30am in observance of the Thanksgiving holiday. Users are not permitted to enter the facility during these times. Thibeault 21:38, 18 November 2020 (PST)
UCSB Flu Vaccination Mandate
UCSB Students, Staff and Faculty are required to recieve a Flu Vaccine by Nov. 1st.
Please see the COVID19 Page for relevant links and information.
// John d 19:47, 13 October 2020 (PDT)
NanoFab COVID Protocols
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
Contact the Lab Director for more information.
The most recent COVID Protocols can be found at COVID-19_User_Policies.
// John d 15:00, 19 July 2020 (PDT)
New Tool Installations
See the News Feed for info on two upcoming tool installations!
The Raith Velion FIB is up and running, and Dr. Dan Read is qualifying the tool. See the Velion's Tool page here.
The Heidelberg Maskless Aligner has been installed, and is in the process of being qualified/characterized. See the MLA150's tool page here.
// John d 09:10, 18 July 2020 (PDT)